What do you do with your ceiling?

Renovation is very necessary to do ceiling, it can make up for the top of the indoor defects, the interior decoration will be more beautiful, the general approach is to do a unified panel on the top, so convenient, then this ceiling can do it yourself? Here's a look at your own ceiling method . What should you do with the ceiling?

Your own method of ceiling 1. Construction preparation

First, construction preparation

All kinds of pipelines and equipment in the ceiling must be installed before the ceiling of the ceiling, and the lighting position and position of the top surface of the indoor lighting must be determined, as well as the position of the ventilation openings. Then the ceiling construction operation shelf should be set up. If it is Large-scale light steel frame ceilings also need to be modeled first, and the construction of the ceiling, vents, curtain boxes, and lamp channels must be performed.

Your own method of ceiling 2. Material and tool preparation

The materials and tools for ceilings must be fully prepared. The materials include aluminum alloy ceilings, keels, and hangers. If the tools are used, there are many more. There are folding lines, ink fountains, hammers, level gauges, squares, hanging hammers, and nails. Guns, planes, screwdrivers, impact drills, toothless saws, hacksaws, etc.

Your own ceiling method 3. Installation process

a.

Use mark-line methods to mark all positions, especially mark the horizontal line, height, and the center of the room. Draw the keel position line at the center of the room.

b. Install the main keel boom

After playing the various lines, according to the elevation of the lower end of the boom, a suspender rod with a diameter of 8 round steel is installed and fixed on the ceiling with a diameter of 8 expansion bolts, and the span of the suspender is controlled within a range of 1200 mm.

c. Install the main keel

Choose C38 light steel keel or wood strip, the main keel spacing should be in the range of 1200mm, the installation as long as the main keel supporting hanging pieces and the boom connected on the line.

d, install the edge

Then the edge band can be fixed with concrete nails around the wall. The distance between cement nails is not more than 300mm.

e. Installation of secondary keel

The sub-keel fitted with the plate is installed. The sub-keel is hung on the main keel through a hanging piece. If the length of the sub-keel needs to be extended for multiple lengths, the sub-keel connecting piece is used to connect the opposite ends of the keel and straighten them. fixed.

f, install the metal plate

In the middle of the assembly area, draw a reference line perpendicular to the direction of the keel, and align the reference line to the two sides to install the metal plate. When installing, gently pull the metal plate, press the two sides of the square plate gently in the order of the flanges, and then insert them into the keel. Push it tightly.

g, clean up

The cloth is then wiped clean, with no dirt and fingerprints.

h, acceptance

If you ceiling yourself, then you can accept it or not, provided that the quality is guaranteed.

Editor's Note: The above is about the method of own ceiling method , I believe that after the small series of sharing, many people can understand what to do ceilings, pay attention to the kitchen and bathroom when doing their own ceiling, especially like the hood of the pipeline route The class should pay more attention to it.

Smart Bulb

JIANGMEN MOSCOT OPTOELECTRONIC TECHNOLOGY CO.,LTD. , https://www.jmsensorsled.com

This entry was posted in on