From the outset, it was decided that the hydropower reform would use a regular professional company.
However, after the budget was completed and the xx copper pipe was played, it was clear that this large, formal company simply couldn't see it. Measured myself, the total length of the water does not exceed 20 meters, and the total length of the electricity does not exceed 20 meters. According to the current market price, which is 1k or less.
Because I did not want to delay again, so let the decoration team find a change in the waters of Tiantongyuan. Kinder PPR, 35 yuan / meter, including the slot. The final total length calculated is 16.8 meters. The suppression also passed. But did not find what they want to warranty, feel that it is only a psychological comfort (decoration team to do the change of water, who can guarantee that they are still in Beijing during the warranty period?).
The circuit originally wanted to transform part of it within 20 meters. But always feel that the electrician is too unprofessional. Just let him open a few slots in the living room and add 4 sockets. The lamp in the living room does not change.
Always feel uncomfortable, but I can't tell where it is wrong.
Kitchen, bathroom tiles have been posted, and there is basically no room for change in the water circuit. But in other rooms, the lights in the living room need to be moved. The bathroom lacks a mirror light (you can also do it with tiles already attached?), the main bedroom lacks a wall lamp, and the restaurant light is not yet... Is it going to go on like this?
Perhaps it is because of this reason. Originally thinking about this hidden project to find a professional company, the result has become four different. I don't feel bad about changing the cost of water to electricity, but I really don't need big changes (if it wasn't for gas water heaters that moved to the window, I might only have more than 3 meters of water), but will livelihood suffer from discrimination? Now just hope that the decoration team can do a better job.
When the water pipe was put on top of the house, I gave up the straight line walking vertically along the wall to walk the yin and yang angles, and went straight at the origin and the target point. (Cause: The individual thinks that the water path is the less chamfer the better. 1. Reduce the resistance to water flow. ;2, the short flow of hot water can partially reduce the loss. However, in the middle of this diagonal line is the position of the light bulb. To avoid problems that may occur due to the intersection of the wires, the section of the ppr tube that is suspended on the roof of the room is not expected to be straight. Is there any hidden danger?
Hydropower renovation experience on socket room window gas water heater decoration living room mirror lamp bathroom tile ceramic tile price kitchen tile
Solar Camping Lighting System,Outdoor Solar Energy Lamp,Solar Energy Lighting
Guangdong Dp Co., Ltd. , https://www.dp-light.com