Decoration has always been a matter of great importance, and every link cannot be ignored. In the previous article, I introduced a lot to you. Today, the decoration house decoration network Xiaobian will introduce the relevant knowledge of the inspection procedure for everyone!
Step 1: Check if there is an empty drum on the wall. Due to its concealment, the empty drum phenomenon is often ignored by the majority of owners. However, if the wall hollow is not found and processed in time, it will be extremely unfavorable for the future renovation project. The wall hollow is the main culprit in the cracking and shelling of the base material in the wall. Therefore, it is necessary to carefully check whether there are empty drums on the wall surface. All walls must be checked one by one. If the phenomenon of emptying in your home is serious, the same problem often exists in other homes. In the stage of centralized housing collection, real estate developers will focus on solving them.
The way to check the empty wall is to sweep the wall with a loud drum and listen to the sound of the wall. “The sound is dullâ€, which proves that there is no empty drum under the plastering layer on the wall. “Sound is crisp,†which means there is an empty drum under the plastering wall. It is found that the wall surface with the empty drum phenomenon should be carefully examined for the entire area of ​​the hollow drum, and the empty drum range is marked with chalk.
The second step: circuit acceptance. Many owners often neglect the acceptance of the circuit part in the process of house acceptance, and the circuit problem is indispensable. Lightly, the decoration will be reworked, and the appliance will be damaged. So how do we make an accurate judgment on the circuit condition? The traditional method of testing the circuit with an electric pen or a light bulb is not advisable. The traditional method can only reflect whether the circuit is connected, but whether the ground wire or the zero fire wire is wrong. Information such as whether the leakage or leakage protection is working can not be fed back. In order to complete the standard circuit acceptance work, we need to have a professional tool - power inspection plug (market price 15 yuan ~ 25 yuan, electronic city or Taobao have to sell). The specific use of the power inspection plug is as follows:
The third step: waterway acceptance. The waterway acceptance at the closing stage mainly refers to the inspection of the drainage pipe. If there is a drainage problem before the renovation, the cost is relatively low. The acceptance method of the drainage pipe is as follows: 1. Use the water basin or small bucket borrowed from or borrowed from the property to fill the water. Pay attention to the water pressure condition of the waterway head. Insufficient water pressure can cause the water sensor to start the gas water heater to start or the solar water heater has insufficient cold water supply. 2. Fill the toilet with water, wash the sink, drain the sink, drain the floor, etc., and check whether the drainage is smooth. 3. Check the problematic on-site mark. If there is no problem, use the plastic bag to block it to prevent foreign objects from falling into the decoration.
The fourth step: inspection of doors and windows, glass sealant. Check whether the doors and windows are open and close smoothly, whether the door and window locks are normal, whether the window glass sealant is even and tight, and whether the window frame and the wall are not flat or sealed tightly to avoid water leakage.
Step 5: Check the crack. Whether there are cracks on the wall, the ground or the top. If local cracking is found to indicate that it is empty, it should be marked to remove; if there is a large crack in the balcony joint, the balcony has already settled; if the top surface crack is found, the floor has been warped, and the oblique crack is found. If there is sedimentation, the crack perpendicular to the beam will be fine if it is relatively small; if a large crack is found on the beam surface, it should be repaired immediately to avoid corrosion of the steel bar.
Step 6: Check the flue exhaust. Light the newspaper near the mouth of the flue and observe the ability of the exhaust of the flue.
Step 7: Check the wall holes. Check whether the air conditioning hole, the exhaust hood exhaust hole, the bathroom venting hole, the gas water heater wall venting hole are reserved, and whether the position is reasonable or not, if the concealing is required, the ceiling position is too low.
Step 8: Record. Recording work In addition to recording the problems found during the above eight-step inspection, the following sets of data need to be recorded.
1, water distance. (Measure the distance from the center of the toilet pipe to the back wall of the toilet. If you buy the toilet, choose the corresponding model)
2, put on the putty position. (Check whether the part of the rough house has been put on the putty, make a record, and remove it when it is renovated and count it into the budget)
3. Position of load-bearing wall and non-bearing wall. (Required parameters for decoration design)
4. The position of the insulation wall. (Related to the amount of renovation crack prevention treatment, necessary reference data when budgeting)
1. Examine the quality of the house in detail, including whether the doors, windows, balconies, etc. are cracked.
2. Check the flatness of the wall, whether it sees water, and whether there is crack. In particular, check if some walls have water marks, especially in the kitchen sanitary tops, exterior walls, etc. If necessary, please find out the reasons as soon as possible, and let the developers carry out repairs.
3, carefully check the ground for empty shell cracking. If there is an empty drum must be accompanied to accompany the property personnel to repair as soon as possible, otherwise it will be easy to penetrate the floor in the decoration.
4. Check the smooth flow of water, electricity and coal, and whether it can be used normally.
5, open all the taps to check for leaks, as much as possible to make the water flow a little more urgent, in order to check the water pressure and test the drainage speed.
6. Use the test pencil to check whether the strong and weak powers are unblocked, and close the gate to check whether each switch completely controls each branch line.
7. Acceptance of water discharge includes basin launching, bathtub launching, toilet launching, kitchen and sanitation, and balcony floor drains.
8. Appoint the owner upstairs and downstairs to check whether there is water leakage and seepage on the floor above the floor, on the ceiling, on the ground and on the floor under the ceiling, and record the water meter.
The above is the knowledge of the home inspection steps introduced by the decoration home decoration network Xiaobian, I hope to bring help for your decoration! More relevant knowledge, all in the decoration encyclopedia section!
Precision alloy, is a kind of alloy owning special physical properties (such as magnetism, electrical, thermal and other properties).The vast majority of precision alloy is black metal based, only a few is based of nonferrous metals. It usually includes magnetic alloys, elastic alloys, expansion alloys, thermal bimetal, electrical alloy, hydrogen storage alloys, shape memory alloy, magnetostrictive alloy and etc.
In addition, in practical application some new type alloy are also considered to belonging into precision alloy, such as vibration damping alloy, stealth alloy, magnetic recording, superconducting alloys and microcrystalline amorphous alloy and etc.
Precise Alloy,Alloy Precision Cnc Machining,Precision Iso9001 Aluminum Alloy,Cnc Precise Alloy Machining
Jiangsu nickel alloy Co.,Ltd , https://www.xhalloy.com