May 6, 08 am, 08 am to 7, most of the Sichuan Basin, Chongqing, Guizhou and Guangxi, most rain in the east, where the eastern Sichuan Basin, Chongqing in eastern, northern and western Guangxi, Guizhou, moderate to heavy rain fall, Guizhou Pingtang ( 73 mm) and Guangxi Lingyun ( 61 mm) torrential rain.
The latest comprehensive monitoring of agricultural drought shows that there are moderate to severe droughts in most of central and northern Yunnan and southern Sichuan; there is light drought in the western part of Guizhou Bijie. Compared with yesterday, the drought in the western part of Guizhou Bijie area has eased.
It is estimated that in the next ten days, the rainfall in the central and northern Yunnan and the western Sichuan Plateau will be less, and the total rainfall will generally be 1 to 5 mm; the total rainfall in western Guizhou is generally 5 to 15 mm, and the local area is about 20 mm; the main rainfall period is 10 days. Before and after.
  
All localities should continue to do water collection and water storage according to the rainfall situation. At the same time, it is necessary to strengthen the prevention of landslides, mudslides and other disasters caused by strong local rainfall , and pay attention to prevent strong convective weather such as local thunder and lightning and hail.
The shaft trolley includes a power cabin and a working cabin. The power cabin is connected to the working cabin through a slewing mechanism for 360° rotation. The inner cavity of the slewing mechanism forms a through hole. The power cabin is connected to the working cabin through the through hole. Lifting agency. Increased construction safety and ensured construction quality and efficiency.
Staircase Shaft,Construction Shaft Stairs,Shaft Stairs Passages,Shaft Stairs In Underground
Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com