In the decoration of the bathroom, the quality of the ceiling determines the style of a bathroom. The integrated ceiling bath is used the most times because it integrates lighting, heating and decoration, allowing you to enjoy the warmth when bathing in the winter. In the installation of integrated ceiling Yuba, you need to pay special attention to today's Xiao Bian will give you a brief introduction to the installation method of integrated ceiling Yuba , we quickly learn it! First, integrated ceiling Yuba installation steps
1, the corner line installation
The installation of the collection bar needs to be smooth and firm, determine the installation height, and draw a horizontal line. In the case of horizontal tiles, the matching corner lines of the ceiling will be tightly fixed on the tiles, so that there is no obvious gap.
2, the installation of keel
The distance between the suspender and the light steel keel, the suspender and the keel, and the size of the panel must be the same. At the top, inflate the eye and fix all the suspenders. The lower end of the suspender is connected with the hook, and then the main dragon skeleton is fixed in the middle of the hook. Adjust the height of the nut so that the main keel bottom plane is 3cm away from the upper plane of the edge trim. And tighten it. 3, install the keel
According to the actual installation length minus 5mm required to take off the keel, put on the triangle hanging pieces, according to the drawings required to pay all the keel with a triangular hanging temporarily hung on the main keel.
4, the buckle board installation
Wear clean gloves and install the gussets to consider the overall aesthetics and symmetry between the two sides.
Fix the template and use a utility knife and ruler to characterize it more than three times. Fold the edge and cut it to a 90-degree angle with a pair of scissors. Corresponding surface of the template cutting hole is stuck in the keel, the cutting surface is put on the edge strip, and the edge strip clamping position is pulled out to clamp the template. At this moment, the triangle hanging piece can be clamped with the steel pliers and the main keel. .
When the middle part of the template is installed, the two corresponding surfaces of the template are respectively stuck in the keel to control the gap between the templates and maintain the straight line of the seams. Note: After completing the installation of each row of templates, the triangular hanger shall be clamped with the steel pliers and the main keel.
According to the design of the drawings, when the installation location of the heating type host is met, the host panel is used instead of the template to confirm the accurate host installation position; then the main cabinet is placed on top of the pay keel and fixed. Install (embed) electrical appliances, to make the panel and electrical interface smooth, seamless.
6, the top line and mouth panel
The top of the line, to determine where the need to install lamps, which places need to install kitchen and toilet appliances, in advance the line layout. Button panel, this link is directly related to the overall effect of the ceiling. Not only do you have to be flat, but you have to do it straight.
The correct installation sequence in the bathroom is to install the bathroom heater, exhaust fan, and then do the ceiling. Do not install the exhaust fan or bathroom heater directly on the aluminum gusset plate with screws, and use the expansion bolts to hang directly on the concrete on the top. Understand the installation method of integrated ceiling Yuba , after the installation of the decoration workers after the inspection is also more clearly! Hope to help you, want to understand other building materials knowledge, please continue to pay attention to this site, more exciting so stay tuned!
HDPE
1, the corner line installation
The installation of the collection bar needs to be smooth and firm, determine the installation height, and draw a horizontal line. In the case of horizontal tiles, the matching corner lines of the ceiling will be tightly fixed on the tiles, so that there is no obvious gap.
2, the installation of keel
The distance between the suspender and the light steel keel, the suspender and the keel, and the size of the panel must be the same. At the top, inflate the eye and fix all the suspenders. The lower end of the suspender is connected with the hook, and then the main dragon skeleton is fixed in the middle of the hook. Adjust the height of the nut so that the main keel bottom plane is 3cm away from the upper plane of the edge trim. And tighten it. 3, install the keel
According to the actual installation length minus 5mm required to take off the keel, put on the triangle hanging pieces, according to the drawings required to pay all the keel with a triangular hanging temporarily hung on the main keel.
4, the buckle board installation
Wear clean gloves and install the gussets to consider the overall aesthetics and symmetry between the two sides.
Fix the template and use a utility knife and ruler to characterize it more than three times. Fold the edge and cut it to a 90-degree angle with a pair of scissors. Corresponding surface of the template cutting hole is stuck in the keel, the cutting surface is put on the edge strip, and the edge strip clamping position is pulled out to clamp the template. At this moment, the triangle hanging piece can be clamped with the steel pliers and the main keel. .
When the middle part of the template is installed, the two corresponding surfaces of the template are respectively stuck in the keel to control the gap between the templates and maintain the straight line of the seams. Note: After completing the installation of each row of templates, the triangular hanger shall be clamped with the steel pliers and the main keel.
5, the installation of the host
According to the design of the drawings, when the installation location of the heating type host is met, the host panel is used instead of the template to confirm the accurate host installation position; then the main cabinet is placed on top of the pay keel and fixed. Install (embed) electrical appliances, to make the panel and electrical interface smooth, seamless.
6, the top line and mouth panel
The top of the line, to determine where the need to install lamps, which places need to install kitchen and toilet appliances, in advance the line layout. Button panel, this link is directly related to the overall effect of the ceiling. Not only do you have to be flat, but you have to do it straight.
The correct installation sequence in the bathroom is to install the bathroom heater, exhaust fan, and then do the ceiling. Do not install the exhaust fan or bathroom heater directly on the aluminum gusset plate with screws, and use the expansion bolts to hang directly on the concrete on the top. Understand the installation method of integrated ceiling Yuba , after the installation of the decoration workers after the inspection is also more clearly! Hope to help you, want to understand other building materials knowledge, please continue to pay attention to this site, more exciting so stay tuned!
Integrated ceiling Yuba Yuba
Main maetrial of Concrete plastic insert
No. |
Technique parameter |
Unit |
Technical requirement |
Value |
1 |
Density |
g |
1.3-1.45 |
1.45 |
2 |
Tensile strength |
Mpa |
≥170 |
178 |
3 |
Elongation |
% |
≤4.4 |
4.0 |
4 |
Bending Strength |
Mpa |
≥250 |
290 |
5 |
Impact Strength(No gap) |
KJ/m2 |
≥80 |
85 |
6 |
Melting point |
°C |
250°C-270 |
270 |
7 |
Insulation resistance |
Ω |
≥1×108 |
5×108 |
8 |
Glass fiber content |
% |
30-35 |
35 |
9 |
Hardness |
HRR |
≥110 |
118 |
HDPE
No. |
Technique parameter |
Unit |
Technical requirement |
Value |
1 |
Density |
g/ |
0.95-0.98 |
0.95 |
2 |
Tensile strength |
Mpa |
≥19 |
19 |
3 |
Elongation |
% |
>80 |
150 |
4 |
Melting point |
°C |
170-190 |
190 |
5 |
Insulation resistance |
Ω |
≥1×1010 |
3.5×1010 |
6 |
Hardness |
A |
≥98 |
98(A) |
Rubber Rail Pad,Rail Seat Pad,Anchor Bolt Sleeve,Anchor Bolt Dowel
TAICANG ZHONGBO RAILWAY FASTENING CO., LTD. , https://www.railfastener.com