Checking the house is an indispensable step when handing in the house. The quality of the house inspection will directly affect the progress of the renovation in the later period. Therefore, it is necessary to be very cautious and not sloppy. Then, how do you check the house when you submit the house ? Here we will introduce in detail: rough room inspection methods and precautions, I hope to help you.
How to check the room when you submit the room :
First, how to inspect the house when handing in the house ---- blank house inspection method
1. Wall
Tap the wall with your hand to judge whether the wall is empty by sound and visually check for cracks.
2, roof
Take five points from the ground and use a tape measure to measure the height of the room. If the values ​​are different, the roof is tilted.
3, pipeline
Shake the heating pipe and the upper pipe vigorously to see if it is firm. The sewage pipe may be blocked by garbage, so open the water valve to see if the drainage is smooth.
4, kitchen flue
Place smoked paper under the mouth of the flue to see if the smoke can rise normally.
5, pipeline gas
Place smoked paper near the alarm to see if the alarm is sensitive and check that the air intake solenoid valve is convenient to use.
Second, how to check the room when the delivery of the home --- rough house inspection room matters needing attention
1, inspection
A. Each switch in the switch box is marked. If there is no or no understanding, correct it immediately.
B. The switch must be firmly installed. Each must be shaken to see if it is loose.
C. Check the cable sockets and broadband sockets to see if they are loose or plugged in.
D. Check the number of weak outlets.
E. Check the video intercom and see if the emergency call button is normal.
F. Check the entrance doorbell: if the doorbell is not ringing or ringing.
2, measuring height
Use a box ruler to inspect the roof, take 4 points, and measure. The height of the room is about 2.5 meters, which proves that the roof is not inclined.
3, measuring the walls of the air
Using a long ruler, check the air in the wall and check if it is flat. At the same time, inspect whether there are scratch cracks and whether the wall surface has a burst point.
4, corridor windows
Check if there are screens, if not, promptly put forward.
5, check the security door
Check for scratches, whether the door is deformed, whether the door and the box are tightly sealed, and whether the door and the lock switch are smart.
6, check the doors and windows
Check whether the sealing of windows and doors is good or not. A long strip of paper can be used on the sealing point. Close the door and press the paper strip and force it out to see if the pressure of the sealing strip is even.
7, windows
Check push-pull screens and sashes to see if they are smart and collision-free.
8, bathroom
A. Toilets with windows in the corridor should be installed with security nets.
B. If there are no windows, there must be ventilation holes above the ceiling.
C. The socket closest to the vent must be a waterproof socket.
Summary: When you submit a house , how to inspect the house and the knowledge of the blank house inspection methods and precautions are introduced here. If you need to know more information, please continue to pay attention to this site, we will have more exciting content for you .