Decoration details construction 10 big catty exposure

In order to save money and time, construction workers take various measures to cut corners. How much paint is needed to paint a wall? Some construction workers told the owner that they need 6 barrels of paint. In fact, only 5 barrels were used. The remaining barrel was sold to the dry work site. Some companies required the interior wall to be brushed 3 times. Wall paint, but the construction team brushed only once, the surface does not see any difference, but in fact it has reduced the process standards; and as above the transformation of water, waterproof leakproof project, strong electric weak transformation, air conditioning pipeline and other projects, It is difficult to see the problem in the short term. Over time, problems will be exposed.

The process of decoration by consumers should be carefully supervised. Now we have concluded that there are 10 construction processes and decoration pitfalls that are most likely to be cut down by construction workers. When consumers examine the quality of the renovation project, they must grasp these aspects to ensure the quality of the decoration works.

Top10 Wall paint

Steal workers index: ★ ☆

Phenomenon: Latex paint is the most common wall decoration material. It can be painted, rolled or sprayed in specific construction. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially with deeper emulsion paints, this problem is more likely to occur. Experts advise: Before the use of latex paint to add a certain amount of water, deployment of a good latex paint to run out. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.

Top9 sewage pipeline

Steal workers index: ★ ★

Phenomenon: During the renovation of the construction team, in order to save time, a large amount of concrete, sand, and concrete fragments are poured into the sewer. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects have no problems in the final acceptance, they always have problems with poor water. Experts advise: Strict supervision of the construction team, can not use the sewer as rubbish use. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then water-proofed to see if the water is unobstructed and the pipeline is leaky.

Top8 wire connector

Steal workers index: ★ ★ ☆

Phenomenon: When the electrician installs sockets, switches, and lamps, it does not wire according to the construction requirements. In particular, when consumers use some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets are heated and even burned, causing great losses to consumers. Experts advise: In the construction of supervision of electricians in strict accordance with the operating procedures for construction, after all the switches, sockets installed, be sure to carry out the actual use to see if these parts have a fever phenomenon.

Top7 Wall Tile Paving

Steal workers index: ★ ★ ★

Phenomenon: Paving tiles is a technical process. If workers cut corners, they are most prone to problems such as empty tiles, missing seams, and cement and adhesives used for laying tiles. If the ratio is unreasonable, there will be problems such as shedding.

Experts reminded: According to the Beijing Construction Committee issued the "family home decoration project quality acceptance standards," require tile paving should be flat and solid, clear patterns, no dirt and paste marks, the surface color is basically the same, uniform seams, plate crack-free , drop angles and missing edges, local emptying may not exceed 5% of the total.

Top6 Wall tick

Steal workers index: ★ ★ ★ ☆

Phenomenon: The buried pipeline must be slotted on the wall and the ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines.

Experts advise: Before construction, we must reconfirm the direction and location of the pipeline with the construction team leader. For different wall structures, the requirements for slotting are not the same: the walls of the load-bearing wall in the house are not allowed to be slotted, and the wall with the insulating layer is easy to cause cracking on the surface after being slotted, and on the ground Slotting, but also be careful not to damage the floor, causing trouble to the residents downstairs.

Top5 seam modification

Steal workers index: ★★★★

Phenomenon: In some places where the wall meets the door and the window, and where the two different colors of paint are docked, it is also where the workers often perfunctory. You will often see mixed paints between latex paint and wood, with various problems at the joints.

Experts advise: The treatment of joints is very important, you must supervise the workers to seriously construct. If there are two colors of paint on the wall facing each other, it is necessary to apply adhesive tape on the edge of the first color during construction, and then apply another color of paint on it, so that the construction is completed. After tearing off the tape, the entire seam can be very neat.

Top4 wire wear tube

Steal workers index: ★★★★☆

Phenomenon: In home renovation construction, almost all wires are put in pvc tubes and buried in the walls. Therefore, after the electric wire is put into the pvc tube, the consumer cannot see it at all, and it is difficult to replace it. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If workers intentionally cut corners, they would use wires with joints or put several wires in the same pvc pipe.

Experts advise: Consumers are advised to purchase their own wires, then supervise workers' operations at the site, and conduct power-on tests after installation. In addition, consumers must allow the decoration company to leave a "pipeline map." When the electrician had just buried the wires in the wall, he could number the walls and draw a floor plan. Then he used the strokes to draw the direction of the wires and the specific location of the wires, indicating the position on the floor, the ground and the adjacent wall. In particular, the position of the joints of the pipelines should be marked so that in the event of a fault, the line position can be found immediately.

Top3 facet processing

Steal workers index: ★★★★☆

Phenomenon: The so-called "small face" is a small place that some consumers can't see and can't pay much attention to, such as the upper edge of the door, the underside of the window sill, and the inside of the heating cover. Some workers will be here. If you cut corners, you will not even do anything.

Experts advise: Remember that there are 6 planes for any object. Don't ignore any details when checking the quality of the project.

Top2 ground leveling

Steal workers index: ★★★★★

Phenomenon: Some houses are not well-grounded and need to be re-leveled during the renovation. If the workers are not careful or intentionally sloppy, it will cause the problem of “more and more unevenness”, and the cement mortar used in construction will also greatly increase the ground load, causing hidden dangers to the safety of the building. Experts advise: Before ground leveling, ground surface treatment must be done first, and then use cement mortar to level the ground. After the cement is dry, determine the flatness of the entire floor using a dedicated level ruler, and then proceed to the next step.

Top1 substrate treatment

Steal workers index: ★★★★★

Phenomenon: Before applying latex paint and paving wall tiles, be sure to do the substrate treatment. Some workers cut corners and cut materials in this regard during construction, and the unevenness caused uneven wall surface. After the paint is applied, there is a color difference. When the paint is applied, the paint is discolored and peeled off, or the ceramic tile is not firmly bonded.

Experts advise: In the construction of paving tiles, you should pay attention to the fact that ceramic tiles cannot be laid directly on the surface of lime mortar, lime paste, lime plaster, hemp plaster and latex paint. Can be laid. Bonding pastes used between tiles and substrates should be formulated in strict accordance with the construction standards and proportions, using the specified grades of cement and adhesive materials, and they cannot be randomly deployed.

Decoration catty home improvement tricky three trees paint latex paint cement coating decoration bathroom tile color bathroom waterproof bathroom tile bathroom floor tile bathroom door tile adhesive kitchen tile

Elongated Bidet Toilet Seat

The Elongated Bidet Toilet Seat is indeed a bathroom fixture that offers advanced hygiene and comfort functions. Here are some additional details about its features:

PP Plastic Material: The Bidet Seat is made of durable and easy-to-clean PP plastic. This material is known for its strength and resistance to wear and tear, ensuring the longevity of the bidet seat.

Warm Water Cleaning System: The bidet seat features a warm water cleaning system that provides a gentle and soothing cleansing experience. The adjustable temperature control allows users to customize the water temperature according to their preferences.

Adjustable Water Pressure: Users can adjust the water pressure of the bidet spray to achieve their desired level of cleansing. This feature ensures a comfortable and effective cleaning experience for each individual.

Heated Seats: The bidet seat includes a heated seat function, providing warmth and comfort during use, especially in colder environments. The temperature of the seat can be adjusted to suit personal preferences.

Drying Function: Some bidet seats offer a drying function, which eliminates the need for toilet paper after cleansing. This feature provides convenience and a more hygienic alternative to traditional drying methods.

Hygienic and Comfortable Experience: The bidet seat's comprehensive features, such as warm water cleaning, adjustable pressure and temperature, heated seats, and drying function, contribute to a more hygienic and comfortable bathroom experience. It eliminates the need for toilet paper, reducing waste and promoting better hygiene practices.

Sleek and Modern Design: The bidet seat's sleek and modern design adds a touch of sophistication to any bathroom decor. It blends seamlessly with the existing fixtures and enhances the overall aesthetics of the bathroom.

Investing in an Elongated Bidet Toilet Seat is a practical choice for individuals who prioritize hygiene and comfort in their daily lives. It offers advanced features that enhance the bathroom experience and promote better personal hygiene practices.

Elongated Bidet Toilet Seat, Electronic Bidet Cover, Elongated Toilet Seat, Bidet Function Toilet Seats

Guangdong Fabia Intelligent Technology Co., Ltd , https://www.smartfabiatoilet.com

This entry was posted in on