1, now there are two kinds of solid wood home, the traditional hardwood furniture generally has no paint layer on the surface, just hot wax. Newly produced hardwood or other solid wood furniture is now protected by a large lacquer or varnish. There are differences in the maintenance methods of differently handled solid wood furniture.
2. The solid wood contains water. When the air humidity is too low, the hardwood furniture will shrink, and when it is too high, it will swell. Generally, solid wood furniture has a shrinking layer when it is produced, but it should be noted when using it. Do not place it in a place that is too humid or too dry, such as near a hot and hot place such as a stove heater, or a place that is too humid in the basement to avoid Mildew or chapped.
3. If it is a bungalow or a low-rise house, the floor should be properly padded if it is wet, otherwise the legs will be easily corroded by moisture.
4, when carrying or moving furniture should be handled gently, can not pull hard, so as not to damage the structure. Tables and chairs can not be lifted, easy to fall off, should be lifted from both sides of the table and the chair surface, the cabinet is best to remove the cabinet door and then lift, can reduce the weight, but also avoid the door activity. If you need to move a particularly heavy piece of furniture, use a soft rope to pull it under the furniture chassis and lift it.
5, the furniture surface to avoid placing too heavy items for a long time, especially TV, fish tanks, etc., will make the furniture deformed. Non-breathable materials such as plastic sheets should not be placed on the table.
6, the room is not flat, the length of time will lead to furniture deformation, the way to avoid is to use a small piece of wood to level.
7. Never wipe the furniture with a wet rag or a rough rag, especially old furniture. Use a clean soft cotton cloth, add a little furniture wax or walnut oil after a while, and gently rub back and forth along the wood grain.
8, the furniture surface should avoid rubbing with hard objects, so as not to damage the paint surface and the surface texture of the wood, such as placing porcelain and other decorative items should be especially careful, it is best to pad a soft cloth.
9. Avoid placing the furniture in front of the large glass window facing south. The long-term direct sunlight will make the furniture too dry and fade.
10, hot water cups, etc. can not be placed directly on the surface of the furniture, leaving traces that are not easy to remove. Color liquids, such as ink, should never be spilled on the table.
The Installation of Mounting Unit
1. Make the concrete base according to solution drawing, locate embedded bolts and set out strings by Laser Level to ensure the centers of embedded bolts in the same elevation as accurate as possible on vertical, horizontal direction and at end face.
2. Locate the Anchor Plate on the concrete base and adjust the position according to solution drawing(remove M14 washer,M14 spring washer,and M14 nut if they are connected to embedded bolts now),and then fasten M14 washer, M14 spring washer, and M14 nut with the tightening torque of 60N.m.
3.Take out the Hexagon Bolt Kit with Post B Corrugated Gasket M12x95 and remove its nut, spring washer, one washer, and corrugated gasket. Insert the Post A, B, C in to Anchor Plate according to the Hexagon Bolt Kit with Corrugated Gasket M12x95 drawing and then fix them by two sets of Hexagon Bolt Kit with Corrugated Gasket M12*95. Post C Post A
4.Remove the bolt kits M12*90 from all the Posts and Pre-Assembled Supports and unfold the embedded Supports, fasten them on the Posts by bolt kits M12*90 according to the drawing.
Installation of Rails
1.Please check the length of Beam before place it onto the Pre-Assembled Supports, otherwise extend it with Splice forBeam first. There are 4 self-tapping screws in each side and total 8 self- tapping screws in both sides. We strongly recommend NOT extend the Beams on Preassembled Supports.
2.Before locate the Beams, mark the position of the Beam son the surface of Pre-Assembled Supports with maker pens according to solution drawing for easier installation. Place the Beams on the 55*80 Tube of Pre-Assembled Supports and fix it with C Clamp Kits. Install all the Beams in the same step. The tightening torque will be 20N.m. C Clamp Kit Side Beam(Please arrange 3-4 persons to install when the array is long.)
Installation of Solar Panels
1.Place the panels above the Beam 85, fixing it with Wide End Clamp Kit in the side and Inter Clamp Kit in the middle. Install all the panels in the same steps until complete installation of al panels. Fasten all the bolts with tightening torque of 10N.m.
2.Complete installation, and please inspect and make sure all the bolts are fastened.
Solar Mounting System For Green House
Solar Panel Mounting Frames,Solar Panel Mounting Systems,Greenhouse Solar Mounting System,PV Mounting Systems
Hebei Honde Plastic & Metal Co., Ltd. , http://www.foundation-system.com