The essence of decoration manual

First, power distribution

Before the renovation, it is best to think about the location of the furniture, where to place the wiring, where there are lights, switches, and sockets, and where to leave it empty, such as when installing the lamp, consider the location of the table. The circuit shall be provided with a total distribution box, and the lines in each room shall be taken separately. The air-conditioner and high-power electrical circuit shall go on a dedicated line. The study should have telephone, closed-circuit, dedicated network cable socket reserved, the living room should have a phone-like outlet in order to facilitate the future installation of the parent machine.

Switch as close as possible to the door, otherwise it will affect the furnishings.

The location of the outlet is critical. If you do not consider it beforehand, there are two consequences: too little or too little. It is unnecessary to say anything about it. The wrong position may cause: Conflict with other equipment or furniture, or obstruction by other equipment or furniture. It is useless.

Lighting should ensure that the vast majority of dual control. A double control light is designed in the aisle and opens from this end. The bedroom lights are preferably dual-controlled, one beside the door and one beside the bed, so as to leave the bed in the big winter and turn off the lights again.

<<< link: User experience: from the start to the acceptance decoration Raiders

1, material:

Conductor: The cross-section should be selected according to the size of the power load. The cross-section of the lighting wire should be 1.5 mm2 insulated copper wire; the cross-section of the common socket should be 2.5 mm2 insulated copper wire; the air-conditioning wire should reach 4 square, otherwise the air conditioner should be used. Easy to overheat and soften. It is best to use cooked glue line, strong corrosion resistance, to buy at big shopping malls. In general, 3 rooms and 2 halls, the use of 1.5M2 wire
400 meters, 2.5M2 800 meters.

PVC pipe: used for the laying of the dark line of the sheathed pipe, with four points on the line, recommended by Hunan wolfberry geese produced.

Junction box: Also known as a cassette, it is best to have a rotatable bar. Later when you buy a socket and a switch, the horizontal switch can be erected. Must choose good quality, in line with national standards, or easy to soften, aging! Before you buy, you must first examine what kind of switch you want to choose. If it is an ordinary switch, you can choose 86 (standard) cassettes; but if you want to choose a conjoined switch such as the Simon 60 series, you may want to choose a non-standard cassette. .

2. Construction:

During the construction process, supervision and inspection shall be conducted in a timely manner, because the line is buried in the wall or in the ceiling, and cannot be inspected at the time of delivery.

1. Observe the depth and evenness of the dark trough so as not to make the wall convex due to shallow troughs.

2. When the hydropower cables are laid, separate the Water Pipes and the wires and pipes, take the water pipes to the wall, slot the wires, and walk the wires to the top. In case of water leakage, no electric shock will occur! Water pipe as far as possible to clear the pipe (such as the outer wall), try to use stainless steel screws!

Strong and weak electricity should be separated, even if the buried pipeline does not have a sheath. Fireproof paint must be applied to the wood around the line, especially the pipes in the ceiling, which is currently 95% of home improvement will not do.

To ensure the safety requirements for gas pipelines and equipment, the net distance between the electrical pipelines and equipment and the gas pipes shall not be less than 10cm, and the net distance between the wires and the gas shall not be less than 3cm.

3, wire connectors should be located in the junction box. Socket must use three cores, "Fire line into the switch, zero line into the lamp", air conditioning and high-power electrical appliances should be set up separately. The power line and television line, telephone line, and network cable are not installed in the same pipe. The head of the concealed switch and socket junction box should be set at 150 mm. Lines are as free as possible.

4, pay attention to details: For example, the location of the TV socket should be on the side of the TV, not the back; air conditioning socket location, not only to consider the air conditioning machine, but also consider the external machine; wire socket to check to see if there is Ground wire!

5, the construction team left the wiring diagram.

Second, water heating

1, material:

It is recommended that the PPR tube be used best, and the hot melt does not leak. If PPR pipe is used, it will be imported using Pirsa, German crafts, and Turkey; if you use plastic pipe, you will use Kinder, better than Rifeng; if you use copper pipe, use Baoyang, heat insulation, and pipe thickness. At present, aluminum-Plastic Pipes have been eliminated in Shanghai, Ningbo mainly uses PPR, and Beijing uses copper pipes.

The brass pipe has two processes of card sleeve and welding. If it is a card sleeve, the joint will leak for a long time; welding is the best. Regarding copper pipes, Baoyang is better than Sanjing. First, there are two generations, which have good heat preservation performance; second, the wall thickness is thicker than the net thickness.

2. Construction

1, cold water pipe leaking water pipe and Pipe Fittings are not sealed when connected, requiring construction personnel to seal the raw material bandages. Hot water pipe leakage in addition to the seal is not done well, there may be improper use of sealing materials, raw material with a long-term heat easy to shrink and aging, so hot water pipe sealing materials generally use hemp plus lead oil.

2. If the aluminum-plastic pipe is installed, the worker must be supervised on the spot when sealing the cement, and the expansion space is reserved for the hot water pipe according to the construction standards. In short, the aluminum-plastic pipes should not be firmly sealed, but some loose.

3. Be sure to install the filter gasket before connecting the faucet to the water pipe. In addition to the arrangement of the water pipes, it is also necessary to pay attention to the height of the water pipe buried in the wall leading to the faucet, otherwise it would affect the installation height of water heaters and washing machines, for example. Before installing the faucet, ask the workers to carry out the flushing process. The more advanced the faucet, the more afraid of the sand in the pipe. It is recommended to install washable filter and check valves behind the Water Meter .

If you add a pipe to the sewer, you should check whether the old sewer is open before docking the new pipe and the old sewer. At this time, you need to spend money to make sure you don't have trouble.

4, the floor drain must be protected in advance, otherwise blocked up to the general renovation of the whole, the basin mop pool, etc. are installed after the discovery of the water barrier, headache!

After the pipes are installed, the outlet of each cold water pipe must be tested to see if there is no water, otherwise it will be troublesome later.

Take a bucket and pour water into the drains to see if there is any blockage or poor flow. Because during the construction process, the construction team will sometimes sweep sawdust, cement, etc. into the sewer, especially after the cement enters the pipeline, it will quickly form a block and block the water pipe. The construction team can only be withdrawn if it is not blocked and smooth.

5, the triangle valve is not the best not to save. By installing the delta valve, you can find out if there is any water leakage at the copper joint. If it is not installed, it is only when the faucet is finally installed that the pipe is connected to the copper joint. Since leaking water can always be measured for a certain period of time, it is unsafe to install the inner connection and the tap.

Third, prevent water

Waterproof and waterproof and then waterproof, you can walk away from the tube and you will see too many leaking people!

1. Material: Use professional waterproof agent, such as 851, 911; recommend Shanghai Huili 911 waterproof glue.

2. Construction:

1. Be sure to clean the grass-roots floor ready for waterproofing and try to keep the surface dry.

2. The leaking part of the bathroom is mainly at the root of the upper and lower water pipes and at the foot of the wall, so these places must be allowed to “eat” when doing waterproofing. Also note that waterproofing needs to be done not less than 25 cm from the foot of the wall.

3, water repellent with a coarse brush on the ground on the line, to more than 2 times, not too thin.

4, the toilet must be waterproof, including the ground, walls. If the wall of the bathroom is a light wall, it is necessary to waterproof the entire wall.

5, after the waterproof material is dry, a 24-hour closed water test is required. Go downstairs and see if there is any leakage.

6, pay attention to the upstairs sewer pipe anti-blocking maintenance port is leaking, or after the ceiling is done to find it later.

Fourth, mud

1, material:

1, kitchen and bathroom and balcony: It is recommended to use the glazed tile section of vintage fabric, is the current focus of the product, without vitrified tiles and polished tiles. It is recommended to choose such brands as Marco Polo, Nobel, Champions, Rome, and Smike. Advanced floor tiles are easy to clean and clean. Do not use too much ceramic, bathroom tiles, easy to dirty, to start health trouble.

2, brick: If the kitchen area is large, it is recommended to use matte, the effect is better than polishing.

3, cabinet panels: with granite, of course, cabinet companies agree to do so. 70/ square meters of Jinan Qing is a top grade, there are Fuding black, Fengzhen black. The forest green (140/square meter) I use is also quite good. The advantage is that the toughness is good, and the bones are not afraid of being strong. Joints can be leveled and wiped with special adhesive. It's best to make granite measurements. Pay attention to the backstop.

4, the bathroom panel: with granite, black color is better.

5, washbasin and wash basin: do the sub-basin with a "stent installation method", to avoid if after the change basin to knock marble. The basin must be better, good non-stick dirty thing, easy to clean, if the money is recommended, use TOTO, I bought Dongpeng is not bad. Wash basin with stainless steel double basin is best, the basin should be deep, if the money is recommended, then use Oulin; but it is best to be rough surface, glossy too easy to spend. It is best not to use artificial stone as a whole.

How to buy tiles:

A, check the geometric size and flatness: When you purchase, you can use a tape measure to measure the diagonal and the four sides of the brick surface and whether the thickness is uniform. You can also take out any four tiles from the packing box and place them on a flat surface. Then compare the four tiles to see if they are even. Whether the tiles are diagonally connected to the opposite corner. Bring both bricks to the front and face to the front to see if there is a perfect fit.

B. Quality: When tapping on the surface of the tile with a palm, the sound of a good tile is relatively low; the bad tile has a bright sound and there is obvious reverberation. Pour water on the back of the tile to see when the watermark appears on the front. Face the light to see if the surface is even and there are no pores.

C. Chromatic aberration: random out-of-the-box sampling for several batches can be compared one by one. It is normal to have very subtle differences, but if it is obvious, there is a problem. However, the tiles of different production batches will also have a color difference, so it is best to buy enough quantities once, otherwise it will be hard to find a consistent color match.

How to buy granite:

Use simple test methods to check the quality of the stone. Usually, a small amount of ink is dripped on the back of the stone, such as the ink quickly scattered around, indicating that the internal particles of the stone are loose or have gaps, and the quality of the stone is not good. On the contrary, if the ink drops are not moving, it indicates that the stone is dense. .

2. Construction and acceptance:

1. The tile should be knocked for 12 hours after the floor tile is laid. There must be 3/4 empty drum above the brick and must be reworked.

2. Keep the floor tile as low as possible. It's best to stick well with the floor after laying the floor. Putting on the door stone is very good.

3. Plastering bricks and wall tiles. It is recommended to use grouts for brick joints. Do not use white cement for jointing. Stitching is beneficial to protect bricks and cleaning. The seam is normally 1mm.

4, in order to facilitate drainage, the balcony, bathroom, kitchen (if there is a floor drain) and the toilet floor must have an inclination. Pour a pot of water and see if it is flowing in the direction of a sewer/drain. When the bathtub is installed, it should be slightly tilted toward the water. If the bathroom or kitchen floor is higher than the hall, you can use the door stone to solve the problem.

5. Make a waterproof test on the floor of the balcony, the kitchen and the toilet, and close the water in 48 hours.

6, to a map of water pipes, spare.

3, other

A, floor tiles or to good quality. In general, the larger the tile size, the more expensive it is, and you can choose a smaller-size promotion Scomi, which is practical and practical. The balcony can be attached to an external wall brick, which is beautiful and cheap, and is not afraid of it split! Cost-effective!

There is no problem with the Smick's floor tiles; the walls are all arched, with poor quality and excellent quality. Rome's ceramic tile was very good. In addition to the pieces sent, it was broken. It was returned on the spot and later made up. Other basic problems were not found.

B, tiles should be more appropriate to buy some, because it is impossible to buy the right number, more and the boss can talk about retreat, less may not make up for the same (especially the same color) products.

C, tile Yang angle do not use the edge line, to tiler grinding 45 degree angle mosaic is beautiful, you do not mention the bricklayer of course choose to do things lazy way. The color of the floor tiles is difficult to find satisfactory, but the two different colors intertwined and then turned to a 45-degree angle can achieve very satisfactory results.

If the tiles add seams with toner, then it is better to adjust them first and then decide the dosage, otherwise it is not too shallow or too dark. Light-colored balcony bricks can not be dirty, you can use quartzite; kitchen tiles do not buy light-colored or matte, otherwise it is difficult to greasy greasy.

D. Do not use marble as much as possible on the window sill. It is recommended to use granite (such as: leopard skin, red and green color, etc.), because marbles like big flower green and violet are light indoor stone, and the sun will change color in a year. No gloss, but also sun cracks.

If the hall is covered in marble, it is recommended not to use the Chinese-specific paving method of “dry and wet sand” because too much water will make the surface of the stone dry after water lines and water, and ordinary home-improvement workers do not have this level of laying. It's best to use the "tile tile dry shop" method.

E. After paving the floor tile, be sure to use a bitumen paper or paper and other paving, in order to carry out the next process.

Fifth, doors and windows

If you do plastic doors and windows, Shide and Conch are recommended. Anti-theft door should choose the northeast production such as casting Chengpan, Panpan, Maxim, careful selection of products such as Zhejiang in the south, too light, flashy.

Interior doors are better customized by franchised home owners. Door handles use copper handles to eliminate bacteria.

Plastic steel windows must be sealed; when the original iron windows were replaced with plastic windows, the workers lazily said that no sealant was needed. As a result, my family was flood-resistant every summer when heavy rains came in. Water would seep through the window seams, and the cement could not stop. .

It's best to install a door stopper. If there is no door stopper, the door handle will crash the wall.

Sixth, painter

1, material:

Floors and furniture: There are two types of solvent-based polyester paint and water-based paint on the market. Polyester paint contains xylene and formaldehyde. It is harmful to the human body. It is not resistant to scratches and cannot be used on cork flooring. In most cases, the day Can only paint again, the paint is easy to turn yellow. Water-based paint is used as a solvent for water. After the water evaporates, the paint film forms. It has no xylene, formaldehyde and other substances. It is very environmentally friendly, does not change yellow, is quick-drying, and is more wear-resistant. There is also a division method is divided into light, matt and semi-matt. I tend to use matt waterborne floor paints such as Nippon floor paints and furniture paints.

Wall: Wall paint (latex paint) with Duolishi (ICI) five-in-one or Nippon three-in-one (half-light), recommended Nippon three-in-one, crack resistance is more than Dulux 5-in-1, and it seems to be cheap . It should be sealed with primer (moisture resistance, enhanced paint adhesion). For economic considerations, it is recommended that the ceiling be ultra-white with Nippon, very cheap and practical.

Determine the color of the wall: first consider the orientation of the room. The south and east rooms have plenty of light. The walls should be light blue and light green. In the north room or lack of light, the walls should be warm, such as milk yellow, light orange, light coffee, etc. Color should not be used in dark colors.

It is recommended that the paint be sprayed on the latex paint, which is better than the hand brush roller, but the waste is relatively large.

Every time a worker brushes it, he must look at it once and look at the lamp carefully to find faults. Touch it with your hand, is it flat?

2, other

The wall is recommended to use brand promotional wallpaper, which is better than paint, that is beautiful and convenient, do not have to worry about the problems such as wall paint brushing, as long as the furniture is properly matched, the effect is first-class, and the hiding power is the best (do not see the wall at all) Face), but it is best to choose full paper or wooden paddles. If you must choose the wall paint, it is recommended to choose the ordinary products of the brand paint, Wei Wei ordinary paint is very affordable, there are five-in-one, five-in-one gold, but also the second-generation five-in-one and so on.

VII. Carpentry

1, material:

Wood floor: It is recommended to dry the board with oily (such as teak), that is not painted floor, do not use the paint-free board that has been painted. After the paint-free board is covered with crevices, it is easy to accumulate dirt in the joints and it is difficult to clean them unless grouts are used. And it will make the front and back of the floor unevenly wet. After the paint on the board, the overall effect is good, and the flatness is easy to correct. In addition, Beijing is now popular for the use of geothermal floor, the best choice for geothermal floor. Others in this regard do not understand because I am in the South. The length of the wooden floor is generally 750, 450, 300 and other specifications. I suggest using 450 wooden floors. This can be a good balance between aesthetics and reducing the length of the long and easy arching. The longer the wooden floor, the easier it is to arch.

Ceiling: aluminum buckle plate, do not PVC, thickness to buy more than 0.6. It is recommended that the kitchen be long, so that it is easy to clean. The bathroom can be used microporous aluminum (so that the winter bath will not have water vapour condensation on the top of the water). It is best to use 300x300mm. If you want to buy aluminum on the fixed side of the aluminum buckle, do not buy iron.

The ceiling of the kitchen and toilet is best, otherwise the smoke black top, and will not be installed for a long time, the top of the latex paint will fall off.

Daixin board (blockboard): It is best to choose machine jigsaw. A section can be sawed during the inspection. The distance between the wooden splints of the middle splint should not exceed 3 mm. Wood with bark, bore holes, and dead knots cannot be used. The material of the middle sandwich is preferably poplar and pine, not hardwood, because hardwood does not "eat nails."

Wood: The moisture content is good. When selecting wood, be sure to carry the ruler and calculator with you. Some unscrupulous merchants are likely to work on these two things, and they can bring them together to compare them and calculate them personally so as not to be fooled.

2. Construction:

Before the paving of the wooden floor, the interior decoration of the ceiling and inner wall surface was completed, and the indoor wall air conditioning hole was drilled.

After all wooden floors have been transported to the construction site, they should be unpacked and stored in the room for more than one week so that the wooden floor can be used with the temperature and humidity of the room. Apply varnish to the back of the wood floor before installation.

1, first clean the ground to ensure that the ground is dry. If the local pit is very powerful, it should be leveled. The method is: add 30% sand with a gypsum adhesive and stir with water to make a paste. Quickly smooth and consolidate for more than 24 hours to ensure that the floor is dry.

2, a layer of asphalt oil layer. Asphalt oil is sold on the market and there is no need to use bitumen blocks for melting. The reason for this is to prevent moisture and insects.

3, playing keel: should use pine, fir and other non-deformable tree species, wooden keel, the back of the skirting board should be anti-corrosion treatment. Level the surface of the keel with a level ruler. If not, adjust the level of the padding. Ventilation slots should be made on the keel.

4, playing floor: generally use 9 centimeters plywood can also be used 12%. The 9-centimeter plate must be cut into four pieces, with a gap of one centimeter between each piece. Then use steel nails to secure the board to the ground. Leave 3 mm gap when installing. It is recommended not to save this procedure.

5. Laying log flooring. With nails on the four sides of the board, note that only two small dots of white latex can be used on each board. Because white latex is water-based, too much moisture will cause the wood to arch. Avoid construction under climatic conditions such as heavy rain or rain. The direction of the paving is based on the direction of the long side of the living room, and other rooms are paved in the same direction. When installing nails should not be too little, and should ensure that the nails, after each installation of a board, with no foot after the foot test sound and then install a piece, if any sound should be reworked immediately. Leave expansion joints (15 mm) on both sides of the floor; the width of the floor should not exceed 6 m in the vertical direction.

6. Polish the floor. At least three times. The second time the polished wood powder should be retained.

7. Fill the gap between the planks with the remaining wood dust.

8, on the wooden floor oil. At least three times.

9, waxing.

Before the ceiling is noticed: Generally, when buying a hood and a bathroom lavender, it is attached with shutters to prevent returning wind. It is necessary to urge the woodworker to install according to the instructions, and some will throw away the shutter because they are lazy.

Ceilings should pay attention to the circuit, electrical equipment to maintain the mouth, with particular attention to the upstairs people access to the manhole, no matter what ceiling, try to avoid, or leave their own maintenance openings. Otherwise, if the pipelines are blocked or leaked or repaired, it will be difficult to do.

Whether the ceiling is horizontal or not, should pay attention to the ceiling. Workers will complain if they don’t care, and they will make up for it with putty. Don’t listen to him. Let him immediately heavier.

3, other

Baseboard made of solid wood, do not use what density plate + veneer, very bad; white skirting with white walls, then a good deal of gaps, I use white silicone to solve it. But be sure to buy high-quality silicone, otherwise it will be yellow and moldy for a long time.

VIII. Late hydropower

1, material:

Toilet: In the choice of split toilet or Siamese toilet, mainly to see the size of the bathroom. In general, toilets occupy a large space, and one-piece toilets take up less space. The main consideration is flushing equipment, the best of all copper, followed by semi-steel semi-plastic, and all plastic only domestic products. Kohler, American Standards, etc. are not good, Kohler is produced in Foshan, and American Standard is produced in Tianjin (ceramic products). If you have money, it is recommended to buy TOTO436, TOTO406 Siamese seat, open the cover to see all copper pieces, at least 20-30 years will not be drip, run, leak! The rest depends on your local situation. It is said that the sanitary wares will leak for a long time.

Sanitary ware test method, using cigarette ash test, one rush is the best.

The size of the wall of the toilet is determined before it can be bought. When installing the toilet, make the drain as high as 2--5mm above the ground as far as conditions permit.

Faucet: The valve body and handle of a good faucet are all made of brass, with a heavy weight and a sense of dignity. Regular products have manufacturer's brand identity in order to identify and prevent counterfeiting. However, some non-regular products or quality products often only have some paper labels attached, even without any marks. When buying, be sure to look for it. Recommended Brand: American Standard.

Switch and socket: The switch should try to use the big board with fluorescent, it is recommended brand: Panasonic, TCL.

Lamps: Do not buy chandelier, dark, easy to deposit dust, difficult to clean, it is recommended to use ceiling lamps, fluorescent lamps. The four-way connection in my home is good. It also saves electricity and is also bright. The Panasonic three-color lamps are not required to be purchased separately.

2. Construction

The toilet must be filled with water before installation and tested for backflow. Backflow is a major cause of water pollution. What brands on the market believe it is, we must try. Many toilets will automatically enter the water at night when the water pressure of the water pipe is too large, resulting in waste of water. When this happens, be sure to replace the fitting that is suitable for high water pressure.

Nine, acceptance materials

Buy materials must first calculate the approximate amount of their own, bad foreman will let you spend a lot of money. No matter how good acquaintances are, they must be carefully inspected when they arrive home.

When the tiles are delivered, they must be noted that: whether the batch number of the same type of brick is the same or not; the four corners are prone to problems, and the whole box is better, especially if it is bulky.

Hardware, no matter the size, the outside is very easy to bump. Lamps and tubes must be lighted one by one.

Three-piece bathroom, although the packaging is very tight, but also to open to see if there is a crack, or their own unacceptable flaws.

The moisture content of the big heart plate should not be higher than 4. 2%, and it is best to buy from the northeast; the thickness of the skin is not less than 1.5mm, and the thickness of the plate is not less than 1. 8mm.

Ten, other

1, the height of the kitchen countertops, bathroom countertops to pay attention to do appropriate, or later discovered that only knocked down and re-do.

2, when the acceptance of attention to the door to switch freely, the window does not seep.

3, the water heater must install a pressure expansion valve. Water heater's dimensions and installation location must be set first! Because the pipe line is the first construction step to be done, the gas pipe, water inlet pipe, and outlet pipe must be calculated as accurately as possible, otherwise when you install the water heater, you will have to cry!

4. If the bathroom is small, try to install a sliding door and do not open the door. However, it is best not to buy sliding doors for furniture. The guide rails for sliding doors will loosen as time goes by. If you must move the door, buy a better guide rail.

If the bathroom is large, you can make a small cupboard under the washstand or under the washstand to facilitate toilet supplies.

The mop pool faucet should be set according to the height of the mop pool, which is too high and the water splashes out.

5, air conditioning holes to be laid in advance, it is best to find the mall to install the team to fight, in the future to buy air conditioning can retreat punch money. The level of the air-conditioning hole must be measured, be sure to tilt outwards, otherwise, a heavy rain will seep. Also note that the height of the air conditioning hole should be appropriate, otherwise air conditioning is not too high or too low.

6, must be carried out according to the normal progress, or the foreman will be based on the order of the workers he can do, my home living room floor tiles to listen to the words of the plasterer finished early, the project has not yet ended, there are numerous empty valley, it is said that cement sand is dry Caused by walking above, but where can the project go in the living room?

7, Towel racks hanging towel, double rod and single rod, when buying it may feel good looking double rod, and the towel can also be more than two, but the actual use is not the case, different uses of the towel Can not hang together, that is to say, a towel rack is also hanging two towels, another out of the rod does not need, or a pole of practical.

Kitchen, bathroom shelves, rings must buy a good stainless steel, or green rust for a while!

8, install the curtain is best not to use the kind of pole that can hang two layers of curtains at the same time, the window screening can be installed directly in the window cover with the slide rail, does not occupy the place and plays the role of isolation. And also avoid the two-story curtain rod is easy to waste. The curtain rods should look good early so that they can be installed before the painter exits. If the paint is lost, you can make up for it. However, the curtain cloth should not be installed, and it should be renovated and reloaded.

9, try not to make woodworking furniture, can buy ready-made buy ready-made. Storage cabinets, shoe cabinet door panels must be customized by manufacturers, do not make woodworking on-site, easily deformed.

10, the tiled wall around the stove wet with water, paste a layer of disposable tablecloths, every time, tear it off again, convenient and clean, do not often clean.

11. Be sure to give the workers rules and inform them before doing any activities. Any hidden or unsatisfactory during the renovation process must be resolutely requested to make corrections as soon as possible, or else it would be even more troublesome to wait in and change it.

Construction Acceptance Paint Window Switch & Socket Furniture Living Room Wall Color Living Room Floor Tile Renovation Living Room Black Floor Marble Dining Table Stainless Steel Towel Rack Cabinet Cupboard Door Cabinet Door Marble Tile Kitchen & Bathroom Ceiling Stainless Steel Cabinet Retro Furniture White Furniture Cupboard Door Cabinet Door Kitchen Wall Tile Kitchen Cabinet Door Floor Tile Marble Cabinet Toilet Door Study Furniture Bathroom Tile Bathroom Door Toilet Ceiling Material Bathroom Wall Tile Toilet Door Size Bathroom Size Bathroom Tile Bathroom Tile Color Bathroom Waterproof Material Toilet Ceiling Bathroom Sliding Door Whole Bathroom Toilet Design Toilet Waterproof Small Study Toilet Leaking Exterior Wall Tile Bedroom Lamp Balcony Study Tile Tile Size Kitchen

S.S. Pipes & Tube

316 Stainless Steel Tube,304 Stainless Steel Tube,201 Stainless Steel Tube

Fenghua Jade Motor Co., Ltd. , http://www.chinaseamlesssteelpipe.com

This entry was posted in on