View one: waterproof engineering
For covert waterproof works, the most important thing is to do meticulous construction. First of all, before the renovation, the construction personnel must do a 24-hour water-retaining test. After confirming that there is no leakage, clean up the ground debris, remove the loose parts, and then use a cement mortar to smooth the uneven areas, and then the entire Flattened on the large surface. Closed water test can also play a role in distinguishing and determining the responsibility of the waterproofing project. There is a leakage phenomenon in the developer; there is no leakage after the renovation and there is leakage, and the responsibility is to decorate the public.
If the bathroom is waterproof, the water will splash on the adjacent wall when bathing. If there is no protection of the waterproof layer, the partition wall and the diagonal wall of the corner will become mildewed, so be sure to prepare the wall surface before laying the wall tiles. Waterproofing, in general, the walls are to be treated with a waterproof height of 30 centimeters, but the non-load-bearing lightweight walls should be waterproofed at least to 1.8 meters high. Special attention should be paid to the corners and strictly prevent the occurrence of drip leaks. In fact, most of the waterproof layer leaks are corners. Therefore, if these places are properly prepared, the possibility of leakage will be reduced.
Decoration Fancy Duplex Decoration Simple Style Cement Lighting Decoration Design Room Ceiling Fan Lights Bathroom Tiles Bathroom Tiles Color Bathroom Ceiling Material Integral Toilet Bathroom Design Bathroom Waterproof Toilet Leaking Tiles
Other Fertilizer And Chemicals,Pharmaceutical Machinery Co., Ltd. , http://www.nsfertilizers.com