At present, real estate developers are generally sold as rough houses. The so-called rough houses have only one house frame structure. The walls and floors of the houses are all cement bases and have not undergone any house renovation. What are the simple renovation steps for the rough room ? What are the precautions for acceptance of rough housing? Let's take a look with Xiaobian.
First, the rough room renovation steps
1. Measuring area: It is advisable to personally measure the indoor area and the area to be renovated before the renovation, such as the painted area of ​​the wall and the laying area of ​​the floor, etc., and then specify the wall size of the furniture to be placed later.
2. Main body demolition: The first item of decoration is the demolition of the main body, which mainly includes the demolition of walls, shoveling of wall coverings, and so on. Secondly, the garbage after demolition should be cleaned up in time and it is convenient for subsequent construction.
3. Hydropower Rehabilitation: Special attention should be paid to hydropower reforms. If bricks are lifted on top, it is difficult to think about sockets and the like. Therefore, it is necessary to confirm the exact position of switches, lamps, and sanitary ware during the hydropower reform.
4. Include the tube: The tube is to wrap up the unattractive pipe, in which the bathroom is relatively humid, so the material of the standpipe cannot be made of wooden keel. Even if the anti-corrosion coating is applied on the wooden keel, it will not work.
5. Wood, tile and oil are put on the court: generally follow the principle of who is dirty first, and follow the order from top to bottom. This will better maintain indoor hygiene without having to clean the room repeatedly.
6. Fixture installation of lamps and lanterns: Next, install the lamps, followed by home furniture appliances, and finally do some soft decoration.
Second, rough housing acceptance considerations
1. Through the above description of the simple decoration steps for the rough house, we already know about the decoration, but we have to pay attention to some problems in the acceptance of the rough room. First, after getting a new house, it is necessary to check whether there is power in each room and whether the outlet switch is normally powered.
2. When checking and accepting rough rooms, pay attention to whether the floors and walls of each room are flat, and whether the walls of kitchens and bathrooms will be empty.
3. Conduct water flow and pressure test for each pipeline, and check whether the gas pipeline is open and whether the commissioning of the heating is normal.
4. Generally, the standard of the delivery of the rough house requires waterproofing. Therefore, two water storage tests must be performed on the bathroom and the kitchen during the inspection. There must be no leakage.
Editor's summary: The above is about the blank room simple decoration steps and rough room acceptance notes related to the elaboration, hoping to help my friends. If you need to know more about the rough house, you can always pay attention to us and the later articles will be more exciting.
Low Shrinkage Twisted Polyester Yarn
1000D 60Z Ls Polyester Yarn,Twisted Yarn For Coated Fabric,Low Shrinkage Twisted Polyester Yarn,Low Shrinkage Twisted Polyester Filament Yarn
ZHEJIANG GUXIANDAO POLYESTER DOPE DYED YARN CO., LTD , https://www.htpolyesteryarn.com