New home acceptance has to pay attention to sub-steps

Acceptance before admission: see whether the demolition and reform project meets the contract requirements, whether there are hidden safety hazards, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming materials are in agreement with the prior agreement.
Acceptance of water circuit: The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, and whether the operation is standardized under the operation of a professional hydraulic or electrician. Reconfirm the actual size of the circuit modification. Only after the line is changed, the putty worker can continue to seal the wall and putty.
According to the drawings, the acceptance of carpentry work is carried out: after the third acceptance is done on the basis of carpentry, the ceilings and plaster lines in the room should also be completed, and the kitchen and bathroom wall tiles have been attached. Painted walls should be scraped twice. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the various parts, if found inconsistent place, promptly prompt the construction team to modify.
Carpentry work quality acceptance: When all the fine wood products veneer is well-glued, the wood line is nailed, the consumer can carry out the fourth phase of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.
Oil work quality acceptance: After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, this is the fifth stage in the phased acceptance.
Acceptance after completion: The final phase of acceptance is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, the construction team should be required to clean the room thoroughly before being removed.
The acceptance stage is not absolute in the actual construction. Different families have different requirements for the decoration content, and the construction progress will naturally have corresponding adjustments, which can be flexibly controlled according to the progress of the project.

Three trees paint entrance decoration room paint home decoration paint bathroom ceiling material bathroom ceiling bathroom floor tile bathroom size

Silicone Lamp

Silicone Lamp,Kids Night Light,Colorful Silicone Lamp,Rechargeable Silicone Lamp

Yuyao Flylit Appliance Co.,Ltd , https://www.flylitappliance.com

This entry was posted in on