US geothermal energy developers plan to inject about 100 million liters of water into Newberry Volcano in central Oregon this summer to test the latest geothermal energy technology.
Newberry Volcano is a dormant volcano that erupted for the first time before the glacial season of the fourth season, producing two volcanic lakes and 400 volcanic ash cones. It has been dormant for 1300 years now.
Alta Rock Energy plans to use 21 days this summer to pump cold water into pre-cut experimental wells at a rate of about 3,637 liters per minute. The depth of the experimental well is about 3231 meters. Below is a seamless rock formation with a temperature of more than 100 degrees Celsius.
According to the assumption, water pressure will cause fine cracks in seamless rock formations, triggering microseisms and forming water storage spaces. At the same time, the water is in contact with the rock formations and the temperature rises.
Scientists will use sensitive seismic detectors to draw a picture of the rupture of the rock formation. After the fracture diameter reaches a certain level, another "production well" will be drilled. This will form a closed circuit, and the water vapor can be brought to the ground and steam driven. Turbine, forming electrical energy.
This process is called "enhanced geothermal system."
For more than a century, people have collected surface hot water or steam to drive turbines to generate electricity, and traditional hydrothermal resources have been fully utilized. Today, the research hotspot has turned to deep geothermal. To this end, scientists have developed enhanced geothermal systems.
However, the enhanced geothermal system also has certain limitations. For example, its ability to destroy subterranean formations is limited, so the output of thermal energy is limited, and it is difficult to support commercial power stations.
To solve this problem, Alta Rock Energy will introduce plastic polymers used to make biodegradable cups in the Newberry Volcano experiment. This tiny plastic polymer can block some cracks, allowing cold water to continue to damage deeper rock masses. After some time, the plastic polymer degrades itself. In this way, the number of cracks will increase greatly than before.
To support the Newberry Volcano experiment, the U.S. Department of Energy allocated $21.5 million. This experiment also attracted some private investment, Google company invested about 6.3 million US dollars for it.
Power stations built with enhanced geothermal systems have no greenhouse gas emissions during operation and have little environmental impact and low cost. However, destroying the rock during operation may cause an earthquake.
Ernie Mayer, a seismologist at the Berkeley-Lawrence National Laboratory, said that the possibility of an earthquake caused by the Newberry Volcano experiment is very small, and that the experimental site is far from the densely populated area. Even if there is a slight earthquake, it will not cause property damage. Despite this, the Department of Energy will closely monitor the experimental process.
HDPE Three dimensional composites drainage net is a new type of drainage geotextile material. It is one three-dimension geonet composited with two needle-punched non-woven geotextiles. Three dimensional composites drainage network consists of a tri-dimension thick vertical rib, and a inclined rip on the top and bottom. Double sided adhesive seepage geotextiles form a"filtration - drainage - ventilation - ." overall performance, and can replace the traditional sand and gravel.wildly used in erosion control, foundation wall drainage, landfill leakage collection, leakage detection, methane gas collection,pond leak detection, roadway and pavement drainage and other subsurface drainage system applications.
Property | Unit |
NLDG 50/D200 |
NLDG 63/D200 |
NLDG 70/D200 |
NLDG 80/D200 |
NLDG 90/D200 |
Test Standard |
Drainage Net Specification | |||||||
Hydraulic conductivity (MD) | m2/s | 2.8×10-3 | 2.8×10-3 | 3.2×10-3 | 4.0×10-3 | 5 x10-3 | ASTM D4716 |
Puncture Resistance | KN/m | 0.17 | 0.17 | 0.17 | 0.17 | 0.17 | ASTM D7005 |
Core Material Geonet Specification | |||||||
Thickness | mm | 5 | 6.3 | 7 | 8 | 9 | ASTM D5199 |
Density | g/cm-3 | 0.94 | 0.94 | 0.94 | 0.94 | 0.94 | ASTM D1505 |
Carbon Black Content | % | 2 | 2 | 2 | 2 | 2 | ASTM D1603 |
Tensile strength (MD) | kN/m | 8 | 10 | 12 | 14 | 16 | ASTM D7199 |
Hydraulic conductivity (MD) | m2/s | 6 | 8 | 10 | 12 | 14 | ASTM D4716 |
Geotextile Specification | |||||||
Unit weight | g/m2 | 200 | 200 | 200 | 200 | 200 | / |
Geotextile type | Continuous filament non-woven geotextile |
Fatures: | Application: |
1.Keep long time stable water conductivity. 2.High tensile strength and shearing strength. 3.Anti-corrosion, anti-acid and long service life. 4.It can bear compression loading over 2000 KPa. 5. Excellent drainage function and long time high press loading. 6. Construction convenient, shorten the construction period and reduce costs. |
1. Tunnel drainage. 2. Landfill drainage. 3. Railway drainage. 4. Retaining walls drainage. 5. Highway roadbed drainage. 6. Underground structure drainage. 7. Garden and playground drainage. |
Company Information _____________________
Name:
Shandong Jinruixiang geotextile material Co.,Ltd
Add:
No.,10 Yuansan road High-tech development Zone, Laiwu City.
Enterprise Culture:
Takes R&D as center, innovation as driving force, market as orientation, and talents as foundation.
Honor and certificate:
Shandong Famous Brand
Certificate of Inspection of Quality:CRCC Certification
Enterprise of Abiding by Strictly Contract and Being Trustworthy
ISO9001:2008 Quality Management System Certification; National Industrial Production License.
Packing Detail:
Delivery:
Q : Are you a factory or trading company?
A : We are a professional manufacturer that specialized in geomembrane, geotextile, Composite Geomembrane etc with ISO9001 certificate more than 15 years.
Q : Where is your factory located? How can I visit there?
A : Our facoty is located is No.10 Yuanshan Road High-tech Development Zone, Laiwu District, Jinan City China. You can take the plan to Jinan Yaoqiang International Airport, then we can pick you up.
Q : Could you send the sample before order confirmation?
A : Yes, we'd love to send a free sample to you for an evaluation if you need.
Q : How about the delivery time?
A : General within 3-7 days after received the deposit.
Q : Can you produce the product according to customers' requirements?
A : Sure, we are professional manufacturer, OEM and ODM are both welcome.
Q : Are you the Gold and Assessed supplier on alibaba?
A : Yes. We are the gold and assessed supplier on alibaba and has got the factory report by SGS.
Dam Liner,Pond Liner,Composite Drainage Net,Hdpe Geomembrane Dam Liner
Shandong Jinruixiang Geotextile Material Co., Ltd , https://www.jrxgeosynthetics.com